Stock and Price
Authorized Distributor | RoHS | Datasheet | Distributor Part # | Pkg (MOQ) | Stock | Pricing | |
---|---|---|---|---|---|---|---|
3720U1/SG25 | Factory Lead Time: 3 Weeks 3 Days | 10,000$337.02 | ViewUSD | ||||
99H7029 | EACH(1) | Out of stock 2 Hours | 1$538.39 5$520.74 10$503.09 25$464.84 50$438.36 | ViewUSD | |||
000000000000525100 | Factory Lead Time: 6 Weeks 1 Hour | 1$504.35 3$490.33 7$470.72 | ViewUSD | ||||
Yes | ![]() | 3720U1/SG25 | (1) | Factory Lead Time: 6 Weeks 7 Hours | 1$414.37 3$408.15 5$402.03 | ViewUSD | |
Yes | ![]() | 3720U1/SG25 | (1) | Factory Lead Time: 6 Weeks 6 Hours | 1$414.37 3$408.15 5$402.03 | ViewUSD |
Descriptions
- RUSSELLSTOLL PLUG 20A 125V 2W3P
- Thomas & Betts
- Plug 20A 125V 2W3P |Abb Thomas & Betts 3720U1/SG25
- FD Plug - 20 Amp - 2 Pole - 3 Wire - 125 Volts - With 9/16 Inch Cable Bushing.
ABB Installation Products may also be referenced as
ABB
ABB - THOMAS & BETTS
ABB INSTALLATION PRODUCTS
ABB Thomas & Betts
ABB-IP INC
ABB/THOMAS & BETTS ELECTRICAL
EMERGI-LITE
Homac by ABB
Joslyn by ABB
STAR TECK BY ABB
T&B Fittings by ABB
T&B LiquidTight Fittings by ABB
THOMAS & BETTS
THOMAS & BETTS POWER